~International
School
|
 |
International
School
445 128th Ave SE
Bellevue, WA
Contract $: 9,442,000
Contract
Date: May 2003
Completion Date: August 2004
26% of work self performed
Owner
Reference:
Bellevue SD# 405
John Amant, 425.456.4510
Architect:
DLR
Group
James Petrich, 206.461.6000
|
| This
modernization and addition included a new roof overbuild, new
gymnasium/locker room, and complete renovation of the entire campus.
The school remained occupied by students and staff during construction.
As with most renovations, BNCC came across unexpected conditions,
however never lost site of the goal and completed the project
on schedule. A member of the school district noted that BSD got
"a significant band for the taxpayers buck".
This
project consisted of the reconfiguration and modernization of
the existing 78,000 SF facility to include new technology infrastructure,
seismic and fire/life/safety upgrades. Work also included a
new roof overbuild and re-roofing of the entire facility. A
new 250 seat performing arts center was also constructed along
with a new band room and adjacent theater support facilities.
The school has interactive white boards (Smart Boards) and LCD
projectors in every instructional space.
|
|
|
|
To report problems,
contact the
|
BNCC,
Inc ~ PO Box 881040 ~ Steilacoom, WA 98388
Wa. St. Construction Registration # BNCCI**012K8
All photos and content property of BNCC, Inc.
Copyrighted © 2006 BNCC, Inc. All rights reserved
|
 |